Management software for drinking water production

For IWB, CTE developed a management software for water production across the entire supply area.

Mandate

With the construction of the new Lange Erle pumping station, IWB wanted to replace the previous water management software (WMS). The new system was to provide hourly updated distribution plans for the pumping stations and groundwater wells to ensure that households and industrial companies in the region had an adequate supply of water at all times. CTE was commissioned to develop the WMS. The contract included the following requirements:

  • Better traceable distribution plans for the next 72 hours based on consumption forecasts. 

  • Input option for operating plan entries (cleanings, revisions, production volumes) 

  • Use of LabVIEW and the LabVIEW NXG web module (new G Web Development Software) 

  • Browser-based access to the user interface 

  • Data exchange via OPC 

  • Simulation tool 

Procedure

A major concern for IWB was the traceability of the distribution plans. The target behaviour was analysed by CTE in many discussions and on the basis of a mathematical model and then written down in a software concept.

During implementation, a simulation tool was created at the same time. Using the consumption data from the previous year, scenarios could be run through, analysed and improved before commissioning.

The water supply also had to be guaranteed during commissioning. It therefore took around three months until all defined scenarios could be run. During this time, the WMS ran in parallel operation. This meant that plans were continuously calculated and reviewed by IWB employees. However, the control system continued to run manually.

Achievements

After a successful year of operation, a balance sheet was drawn up. IWB was very satisfied with the WMS. In the course of a major update, the WMS was again tailored more specifically to IWB. Since then, the WMS has been used by IWB in daily day and night operations.

Thanks to remote access, we at CTE can continue to provide support at any time and carry out minor extensions quickly and easily.

Project Phases

Find out more about our development process.

Picture of Christoph Doggwiler, Systems Engineer at ControlTech Engineering AG.

Are you interested in a similar project?

Book a non-binding consultation with Christoph Doggwiler, Automation Engineer.

Contact us now
Other projects

CTE took over the automation during the technological leap, within an industrial environment, from a laboratory-scale measuring machine to a special machine weighing several tonnes.

2019 to 2021

CTE supported food retailer Pronatec in setting up its own production plant by setting up the IT / OT infrastructure.

2021 to 2022

New construction of a multi-purpose plant for active pharmaceutical ingredients: CTE has taken over the planning of the EI&C and automation for the new construction of a multi-purpose plant in Dottikon.

2017 to 2025